SAMPLE
2 F-16A FIGHTING FALCON INVENTORIES WORLD-WIDE  
USER NAME COUNTRY QUANTITIES QUANTITIES YEAR  
COUNTRIES OF OF IN   OF OBSERVATIONS
  EQUIPMENT MANUFACTURE SERVICE ORDERED ORDER  
BAHRAIN F-16A FIGHTING FALCON USA     1994 Planned 18/24(Including F-16B) Purchased from USAF Stocks NEGOTIATIONS 
            5/94 AF.Postponed to 1995 & Swapped into F-16N
BELGIUM F-16A FIGHTING FALCON USA 72 96 1975 96 Block 10/Block 15 Fitted with LORAL RAPPORT ECM System 1975 AF.18
            Delivery 1979.12 Delivery 1980.19 Delivery 1981.22 Delivery 1982.22
            Delivery 1984.3 Delivery 1985
        44 1983 44(Included F-16B) 1983 AF.12 Delivery 1988.12 Delivery 1989.12 Delivery
            1990.8 Delivery 9/91
          1988 82(+18 F-16B) instead of 135 Upgraded with DASSAULT CARAPACE ECM System
            ON ORDER 1988 $225.0m AF.82 Delivery from 3/95 to 12/96
          1991 110(21%) MLU(Mid-Life Update/Bring Block 15 & Block 16 to Block 50
            Standard) Upgraded with new Avionics & GPS & MLS & AN/APX 113(V) Advanced
            IFF & Helmet Mounted Sight ON ORDER 5/91 AF.Postponed to 1992.Planned EWEP(Electronics
            Warfare Enhancement Program)
          1993 72(From 1991 ORDER) instead of 110 MLU Upgraded with Support ON ORDER 1/93
            $80.0m/$500.0m AF.Reduced to 42(+6 F-16B) ON ORDER 8/93 $285.6m AF.
            Postponed to 1995.42 Delivery from 1/96 to 12/98
          1994 113 in Service at 1/94 AF.
From 1994 AF Composition will be 42 MLU & 24
            non-MLU Operational & 33/45(Included F-16B) to be Disposed of & for Sale
            24/32 Stored & Mothballed).2 Equipped with ORPHEUS Recce Pods 1994 AF.
          1995 1 as MLU/TVI(Trial-Verification-Instal
          1996 Planned 1 as MLU/LTF Prototype Operational Tests from 8/96 AF
          1998 Planned 72(Including F-16B) Operational & 18 RESERVE in Service at 1/98 AF
          2010 Planned to be Disposed of from 2010
             
CHILE F-16A FIGHTING FALCON USA     1994 Planned to Purchase some from USAF Stocks NEGOTIATIONS 12/94 AF
             
CZECH REP. F-16A FIGHTING FALCON USA     1994 24 from BELGIUM AF Stocks NEGOTIATIONS 9/94 AF(Could be Vetoed by USA).
            Postponed & Cancelled 3/95
          1995 24(Including F-16B) from USAF-POF(Previously Owned F-16/Not Excess to be
            Replaced) NEGOTIATIONS 9/95 AF.Postponed to 1996+
        7 1996 Planned 7(Phase 1) instead of 24 from USAF-POF(Previously Owned F-16/Not
            Excess to be Replaced) to be Leased for 3/5 Years from USAF NEGOTIATIONS
            1/96 $73.0m AF
        18 1997 Planned 18(Phase 2)(Including F-16B) from USAF-POF(Previously Owned F-16/
            Not Excess to be Replaced) Stocks & to be "NIGHT FALCON" Upgraded with NVG
            Compatible Cockpit & Exterior Strip Lightning ON ORDER 1997 $250.0m/
            $280.0m AF.18 Delivery from 1998
        18 2007 Planned 18(Phase 3)(Including F-16B) from USAF Stocks ON ORDER 2007 AF
             
DENMARK F-16A FIGHTING FALCON USA 52 42 1979 42 Block 10/Block 15 1979 AF.42 Delivery from 1/80 to 1983
        8 1985 8(Maybe 12) 1985 AF.8 Delivery from 1987 to 1988
          1988 50 In Service 1988 AF
          1991 49(12%) MLU(Mid-Life Update) with Avionics Upgrade & GPS & MLS & Improved
             IFF & Helmet Mounted Sight ON ORDER 5/91 AF.Postponed to 1993.
            49 In Service at 11/91 AF
        3 1993 49(12%)(From ORDER 5/91) MLU Upgraded ON ORDER 1/93 $199.9m/$300.0m AF.
            3(2nd Hand) 6/93 AF+
          1994 6 Converted into Recce Role with Pods(2 VINTEN F95 Cameras & IRLS Scanner)
            3/94 AF
          1995 New Recce Pod 1/95 AF.1st Flight 11/95 AF
          2010 Planned to be Disposed of from 2010
             
EGYPT F-16A FIGHTING FALCON USA 30 34 1980 PEACE VECTOR 1 Program.34 Fitted with WESTINGHOUSE AN/ALQ 131 ECM Pod 6/80
            AF.34 Delivery from 1/82 to 1985
          1992 33 In Service at 1/92 AF
          1993 48(Maybe some F-16B) from USAF Stocks Requested as Free Aid 7/93 AF.
            Postponed to 1995
          1995 30 from USAF Stocks FMS NEGOTIATIONS as Free Aid 3/95 AF.Cancelled &
            Converted into F-16C.
            30 in Service at 6/95 AF
          1996 30 Upgraded with Radar Upgrades & AGM 84 HARPOON Missiles & GBU 15 Bombs
            Delivery Capabilities FMS ON ORDER 6/96 AF
HUNGARY F-16A FIGHTING FALCON USA     1995 30(Including F-16B) from USAF-POF(Previously Owned F-16/Not Excess to be
            Replaced) NEGOTIATIONS 4/95 AF.Postponed to 1996
        18 1996 Planned 7(Including F-16B) to be Leased for 5 Years NEGOTIATIONS/ON ORDER
            1/96 $118.0m & OPTIONS.
            Planned 18(Including F-16B) NEGOTIATIONS/ON ORDER 1/96 $194.0m & to be
            F-16C Standard Upgraded $100.0m.
            Planned 24 from USAF-POF(Previously Owned F-16/Not Excess to be Replaced)
INDONESIA F-16A FIGHTING FALCON USA 8 8 1984 PEACE BIMA SANA Program.8 Block 15 Powered by P&W F100-PW220 Engines 1984
            AF.8 Delivery from 12/89 to 1991
          1991 8 In Service at 11/91 AF
          1994 Planned 5/28 Attrition Buy from USAF-POF(Previously Owned F-16/Not Excess
            to be Replaced) NEGOTIATIONS 1994 AF.Postponed to 199
        5 1998 5(From 1994 ORDER) Attrition Buy from USAF-POF(Previously Owned F-16/Not
            Excess to be Replaced) NEGOTIATIONS/ON ORDER 1998 $116.5m
            Total Required Initial AF 18/20.Raised to 64(All Versions)
ISRAEL F-16A FIGHTING FALCON USA 103 67 1978 PEACE MARBLE 1 Contract.67 Block 10/15 Fitted with AN/APG 66 Radar & LORAL
             RAPPORT ECM System 1978 AF.67 Delivery from 1980 to 1984
          1988 62 In Service 1988 AF
          1993 57 In Service at 8/93 AF.Planned 84(Including F-16B) to be Transfered
            from USAF Stocks(Free of Charge) NEGOTIATIONS 11/93 AF.Postponed to 1994
        36 1994 36 Block 10 Transfered from USAF Stocks(Free of Charge) 2/94 AF.6 Delivery
            8/94.21 Delivery from 9/94 to 12/94.9 Delivery until 3/95
          1995 Planned 36(From USAF) to be Refurbished & Upgraded 1995 AF.Stand-by 3/95
          1996 Planned to be Upgraded with ELTA EL-2032 Radar NEGOTIATIONS 6/96 AF
            Total Required all Versions Initial AF 250.
Reduced to only 210
JORDAN F-16A FIGHTING FALCON USA     1994 24/42(Including F-16B) Block 10 Transfered from USAF Stocks(Free of Charge
            but need to be Upgraded) NEGOTIATIONS 10/94 AF.Postponed to 1995
          1995 12(Including F-16B) Block 10 Transfered from USAF Stocks(Free of Charge but
            need to be Upgraded) ON ORDER 11/95 $400.0m($280.0m+$140.0m Upgrade &
            Modernization)/$600.0m/$1500.0m AF & 24 OPTIONS.Postponed to 1996.12
            Delivery until 11/96
        12 1996 12 Block 10 with 4 F-100 Spare Engines Transfered from USAF Stocks under
            a no-Cost 5 Years Lease Agreement FMS ON ORDER 7/96 AF.12 Overhauled with
            Structural Modifications & Engine Reliability Upgrades FMS ON ORDER 7/96
            $215.0m(Including 4 F-16B) AF.2 Delivery.....
            Total Required Initial AF 36/72
             
SOUTH KOREA F-16A FIGHTING FALCON USA 29 30 1981 PEACE BRIDGE 2 Program.30(Maybe 36) Block 32 Powered by P&W F100-PW-229
            Engines & with Spares & Support 12/81 $931.0m(Including 10 F-16D) AF.30
            Delivery from 3/86 to 4/92
MOROCCO F-16A FIGHTING FALCON USA     1991 16 from US NG Stocks/Surplus & Upgraded with new Engines & 4 Spare Engines
            & Spare with Support & Training ON ORDER 8/91 $250.0m(Included 4 F-16B) AF
            Paid by SAUDI ARABIA.Stand-by
          1992 Refused 4/92 SAUDI ARABIA Funds Unavailable.Unconfirmed
        12 1994 Planned 12(Including F-16B) Purchased from USAF-POF(Previously Owned F-16/
            Not Excess to be Replaced) NEGOTIATIONS 10/94 AF
             
NETHERLANDS F-16A FIGHTING FALCON USA 79 80 1975 80 Block 1/Block 5/Block 10 1975 AF.80 Delivery from 1979
        19 1981 19 Block 15 1981 AF.18 Delivery 6/85.IOC 5/81 AF.99-22 Converted into
            F-16A(R) 1981
          1989 -1 Ground Burnt Out 6/89
          1991 172(32%) MLU(Mid-Life Update) with LITTON LN 93 & Avionics Upgrade & GPS
            & MLS/Improved IFF/Helmet Mounted Sight ON ORDER 5/91 AF.Postponed to 1993
          1992 -1 Crashed 1/92.-1 Lost 2/92.-1 Crashed 5/92.-1 Crashed 9/92
          1993 PACER SLIP Program.136(Including F-16B)(From ORDER 5/91) instead oF-167
            (32%) & 2 Prototypes MLU Upgraded & OPTIONS HMD(Helmet-Mounted Display) &
            AN/APX 111 IFF ON ORDER 1/93 $741.5m/$785.0m($401.8m Engines) AF.Approved
            7/93.136 Delivery from 1993 to 2003.
          1994 144(All Versions)=108 kept In Service from 1994 to 2015 & 36 for Sale.
            -3 Converted into F-16A(R) 1994
          1995 Planned 60 Upgraded with 60 FLIR Pods ON ORDER 1995 $135.0m AF.
            Postponed to 1996
          1996 -1 Sea Crashed 1/96.
            99-20 Block 10(Including F-16B) ON OFFER for Sale I199from 2/96. Bids for
            24(Maybe 50) Recce/FLIR Pods with 4 Ground Stations NEGOTIATIONS 5/96
            $161.0m/DFL275.0m AF.24 Delivery from 1999
          2000 Planned 79-16 Block 10(Including F-16B) ON OFFER for Sale from 2000
          2010 Planned to be Disposed of from 2010
             
NORWAY F-16A FIGHTING FALCON USA 48 60 1980 60 Block 10/Block 15 1980 AF.60 Delivery from 1980 to 1985
          1991 Planned 45(11%) MLU(Mid-Life Update) with Avionics Upgrade & GPS & MLS &
            Improved IFF & Helmet Mounted Sight NEGOCIATION 5/91 AF.Postponed to 1993.
            49 In Service at 11/91 AF
          1992 49-1 Crashed 3/92
          1993 56(12%)(From ORDER 5/91)(Including F-16B) instead of 58 MLU Upgraded ON
            ORDER 1/93 $275.0m AF.56 Delivery from 1997 to 2000
          1996 1 as MLU/TVI(Trial-Verification-Installation) Prototype Operational Tests
            Tape 1 from 1/96 AF
          2015 Planned to be Disposed of around 2015/20
             
PAKISTAN F-16A FIGHTING FALCON USA 29 34 1980 PEACE GATE 1/PEACE GATE 2 Programs.34 fitted with THOMSON-CSF ATLIS LTD
            Pods 1980 AF.34 Delivery from 1982 to 11/85
          1988 34 In Service 1988 AF
          1989 34-1 Crashed 9/89
          1990 33-1 Crashed 1990
          1992 32 In Service at 1/92 AF.32-1 Crashed 4/92
          1994 31-1 Crashed 4/94.-1 Crashed 10/94(Maybe same as 4/94
          1995 30 in Service at 1/95 AF.30-1 Crashed 9/95
PHILIPPINES F-16A FIGHTING FALCON USA   18 1994 18(Including F-16B) from USAF-POF(Previously Owned F-16/Not Excess to be
            Replaced) NEGOTIATIONS 10/94 AF.Stand-by at 6/95 & Could be Replaced by
            F-16C Purchase
             
POLAND F-16A FIGHTING FALCON USA     1995 24 from USAF-POF(Previously Owned F-16/Not Excess to be Replaced)
            NEGOTIATIONS 2/95 AF.Postponed to 1996.24 Delivery from 11/96
        24 1996 Planned 24 from USAF-POF(Previously Owned F-16/Not Excess to be Replaced)
            to be Leased from USAF NEGOTIATIONS 1/96 AF
            Total Required Initial AF 100
             
PORTUGAL F-16A FIGHTING FALCON USA 17   1989 Block 15 NEGOCIATION/ON OFFER FMS 1989 AF.Postponed to 1991
        17 1991 PEACE ATLANTIS Program.17 Block 15 9/91 AF.17 Delivery from 2/94 to 11/94
          1994 4 IOC 7/94 AF
        20 1995 Planned 17 to be MLU(Mid-Life Update/Bring Block 15 & Block 16 to Block 50
            Standard) Upgraded with new Avionics & GPS & MLS & Improved IFF & Helmet
            Mounted Sight System Kits NEGOTIATIONS 6/95 AF.
            Planned 20(Maybe 40) Block 16 from USAF Stocks NEGOTIATIONS
             
SINGAPORE F-16/79 FIGHTING FALCON USA   8 1984 8 ON ORDER 1984 AF.Cancelled & Renegociated with F-16A & F-16B Order
      2 4 1984 4 Block 15 OCU(Operational Capabilities Upgrade) Equipment Including
            Enhanced Avionics & Provisions for BVR(Behond-Visual-Range) Missiles &
            with Spares & Training 1984 $280.0m(Including 4 F-16B) AF.4 Delivery 2/88
          1991 4-1 Crashed & 3-1 Lost 7/91
        2 1992 2 Block 15 Attrition buy Purchased from USAF Stocks 2/92 AF.9(Including
            F-16B) from USAF Stocks Leased for 3 Years 8/92 AF.
            12(Initially 4) with 15 P&W F100-PW-220 Engines NEGOTIATIONS 8/92 AF.
            Postponed to 1993
          1993 11/18(From 1992 ORDER) NEGOTIATIONS 11/93 $436.0m/$890.0m AF.Postponed &
            Converted into F-16C/F-16D ORDER 1994
          1994 Planned 4 to be Upgraded by ISRAEL NEGOTIATIONS 7/94 AF.Postponed
          1995 9/11(To Replace the 9 Leased) ON ORDER 1995 $167.4m AF.Jeopardized 9/93 &
            Converted into F-16C/F-16D ORDER.
            2 in Service at 6/95 AF
          1996 9-9(Including F-16B) Leased 8/92 Returned to USAF 1996.2 FALCON UP
            (Structural Life Extension) Upgraded by USAF ON ORDER 7/96 AF.2 Delivery
            oct.96
            Total Required Initial AF 20
SPAIN F-16A FIGHTING FALCON USA     1994 36(Maybe 40/50)(Including F-16B) Block 15 from AF Stocks with Spare Parts
            & Support& Spare Engines ON OFFER 2/94 $540.0m AF.Lost vs F/A 18A 12/94.
            36 Delivery from 10/95
             
TAIWAN F-16A FIGHTING FALCON USA   120 1992 120 Block 15 Aircraft Updated with MLU(Mid-Life Update/Bring Block 15 to
            Block 20 Standard) with 180 P&W F100PW220 Engines & Spares $500.0m
            (Including 30 F-16B) & 900 AIM 9 SIDEWINDER & 600 AIM 7M SPARROW FMS ON
            ORDER 6/92 $5800.0m AF.60 Delivery from 8/96
             
THAILAND F-16A FIGHTING FALCON USA 22 10 1984 10(1st Batch) Block 15 instead of 12 Fitted with GEC HUD/WAC Aiming Systems
            1984 $320.0m(including 2 F-16B) AF
        4 1987 4 Block 16 1987 AF.4 Delivery from 5/88 to 1991
          1991 12 In Service at 11/91 AF
        12 1992 Fitted with THOMSON RUBIS FLIR Pods.12(2nd Batch) Block 15OCU 1/92 $547.0m
            AF.4 Delivery 10/95.4 Delivery 11/95.4 Delivery 2/96
          1994 Some from USAF-POF(Previously Owned F-16/Not Excess to be Replaced)
            NEGOTIATIONS 10/94 AF
          1995 14 in Service at 6/95 AF.Planned 14 to be MLU(Mid-Life Update/Bring Block
            15 & Block 16 to Block 50 Standard) Upgraded with new Avionics & GPS & MLS
            & Improved IFF & Helmet Mounted Sight System Kits NEGOTIATIONS 6/95 AF
          1996 22/26 in Service at 3/96 AF
            Total Required Initial AF 36
             
TURKEY F-16A FIGHTING FALCON USA   20 1995 Planned 20(Including F-16B) Purchased from USAF Stocks NEGOTIATIONS 12/95 AF
USA F-16A ADF FIGHTING FALCON USA 270 272 1986 Air Defense Fighter Program.Equipped with HF Radio & IFF & ID Light & GPS
            System & with 600 Gallon External Fuel Tank & able to Launch AIM 7/AIM 120
            /AIM 9 Missiles.272(Including F-16B) Modified from F-16A & Upgraded with
            AMRAAM Data Link for AN/APG 66 Radar
      200 2 1972 LWF(LightWeight Fighter) Concept Program.R&D 2 Prototypes(YF-16A) by
             
          1974 1st Flight 1st Prototype 2/74 AF.1st Flight 2nd Prototype 5/74 AF
        6 1975 Win vs F 17A 1/75 AF.FSED 1/75 AF.6 Production 7/75 AF
          1976 1st Flight 1st Production 12/76 AF
          1979 IOC 1979 AF
          1980 MSIP(Multinational Staged Improvement Program) Implemented 2/80 AF
          1981 MSIP Stage 1 Implemented on BLOCK 15 Production Aircraft Delivery from 11/81
          1985 Production AF Completed after 784(Including F-16B) being Built 3/85
          1986 -270 Upgraded into F-16A ADF 1986 AF
          1988 At 1/88 1859 Contracted & 1247 Delivered all Versions AF
          1990 Planned 130(24%) MLU(Mid-Life Update) with LITTON LN 93 & Avionics Upgrade
            & GPS & MLS & Improved IFF & Helmet Mounted Sight ON ORDER 12/90 AF.
            Cancelled 6/92
          1991 -16 Transferred from US NG Stocks/Surplus to MOROCCO 8/91.Stand-by 1993
          1992 -2 Transfered to SINGAPORE 2/92
          1993 Planned -48 from USAF Stocks to be Transfered as Free Aid to EGYPT 7/93.
            Postponed to 1995.
            .84(Including F-16B) Transfered from USAF Stocks to ISRAEL 11/93.
            Postponed to 1994
          1994 500-400/450(Including Block 25 & F-16B) for Sales from 6/94.
            Planned -24(Including F-16B) to be Transfered from AF Stocks to JORDAN
            10/94.Cancelled
          1995 1 as MLU/TVI(Trial-Verification-Installation) Prototype Operational Tests
            Tape 1 from 1/95 to 12/95 AF.
            Planned -24 from AF Stocks to be Transfered to POLAND 2/95.
            Planned -30 from AF Stocks to be Transfered as Free Aid to EGYPT 3/95.
            Cancelled.
            Planned -3....
          2003 Planned to be Disposed of from 2003
            Total Required Initial AF 650 all Versions.
Increased to 1388(Included 204
            F-16B) & Increased to 2729 all Versions.At 12/87 Total Delivery 1569 & 410
            (From European Production) to all Customers.At 1/91 Total ORDERED all
            Versions 3587.Total ORDERED 1300
VENEZUELA F-16A FIGHTING FALCON USA 17 18 1981 18 Block 15 with Spares & Support 1981 $615.0m(Including 6 F-16B) AF.18
            Delivery from 11/83 to 11/85
          1995 18-1 Crashed 8/95.17 Upgraded with HONEYWELL H 423 INS(Inertial Navigation
            System/GG 1342 Gyro) 9/95 AF.17 Delivery 12/95